{"id":11834,"date":"2026-11-18T18:47:52","date_gmt":"2026-11-18T18:47:52","guid":{"rendered":"https:\/\/poligonosanmiguel.com\/?p=11834"},"modified":"2026-11-18T18:48:16","modified_gmt":"2026-11-18T18:48:16","slug":"mexicos-data-center-boom-needs-power-thats-ready-today-poligono-empresarial-san-miguel-already-has-it","status":"publish","type":"post","link":"https:\/\/poligonosanmiguel.com\/ja\/2026\/11\/18\/mexicos-data-center-boom-needs-power-thats-ready-today-poligono-empresarial-san-miguel-already-has-it\/","title":{"rendered":"Mexico\u2019s Data Center Boom Needs Power That\u2019s Ready Today. Pol\u00edgono Empresarial San Miguel Already Has It."},"content":{"rendered":"<p class=\"wp-block-paragraph\">Mexico is preparing for one of the fastest expansions in its digital infrastructure. According to Energ\u00eda Estrat\u00e9gica, the country will add 410 MW of electrical supply for data centers between late 2026 and the first quarter of 2027. Total demand is projected to reach 1,730 MW by 2031, more than six times today\u2019s base of 279 MW.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For companies looking at the Baj\u00edo, the question is no longer whether demand will come, but where the power will be ready to meet it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>A US$82.5 Billion Opportunity<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A study by DCD Intelligence and IDC for the Mexican Data Center Association (MEXDC) estimates the sector\u2019s growth could bring US$82.5 billion in economic impact and more than 133,000 jobs in construction and operation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Quer\u00e9taro is already one of the country\u2019s main hubs, with 21 data center facilities, and global players such as Microsoft, Google, Amazon, KIO and ODATA\/Aligned are expanding across the region.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The Real Bottleneck: Delivering the Power<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">MEXDC is clear about the challenge. As its Executive Director, Adriana Rivera Cerecedo, explains: \u201cThe challenge is not generating energy, but transporting it from where it is produced.\u201d Transmission and distribution capacity, permits and regulatory certainty are now deciding which projects move forward and which remain on hold.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In this environment, a site with power infrastructure that is already built and operating is a real competitive advantage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Why Pol\u00edgono Empresarial San Miguel Is Ready<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">PESMA was designed for high-demand operations:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Power already in place. <\/strong>High-voltage substations that are already operating, with capacity to grow as demand increases.<\/li>\n\n\n\n<li><strong>Full redundancy.<\/strong> Built-in backup ensures uninterrupted power, even during faults or maintenance.<\/li>\n\n\n\n<li><strong>Trusted by data centers.<\/strong> The park already hosts data center operations.<\/li>\n\n\n\n<li><strong>Robust connectivity.<\/strong> Fiber optic infrastructure with multiple carriers and redundant routes.<\/li>\n\n\n\n<li><strong>Strategic location. <\/strong>On the Quer\u00e9taro\u2013San Miguel de Allende corridor, close to the region\u2019s main data center cluster.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Power Ready for What\u2019s Next<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As Mexico races to bring 1,730 MW of data center capacity online, the projects that move first will be those with power already in place. At Pol\u00edgono Empresarial San Miguel, it is.<br><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Contact our team to learn more about available land and power capacity at PESMA.<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Mexico is preparing for one of the fastest expansions in its digital infrastructure. According to Energ\u00eda Estrat\u00e9gica, the country will add 410 MW of electrical supply for data centers between late 2026 and the first quarter of 2027. Total demand is projected to reach 1,730 MW by 2031, more than six times today\u2019s base of 279 MW. For companies looking at the Baj\u00edo, the question is no longer whether demand will come, but where the power will be ready to meet it. A US$82.5 Billion Opportunity A study by DCD Intelligence and IDC for the Mexican Data Center Association (MEXDC) estimates the sector\u2019s growth could bring US$82.5 billion in economic [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":11832,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-11834","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sin-categoria"],"_links":{"self":[{"href":"https:\/\/poligonosanmiguel.com\/ja\/wp-json\/wp\/v2\/posts\/11834","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/poligonosanmiguel.com\/ja\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/poligonosanmiguel.com\/ja\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/poligonosanmiguel.com\/ja\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/poligonosanmiguel.com\/ja\/wp-json\/wp\/v2\/comments?post=11834"}],"version-history":[{"count":2,"href":"https:\/\/poligonosanmiguel.com\/ja\/wp-json\/wp\/v2\/posts\/11834\/revisions"}],"predecessor-version":[{"id":11837,"href":"https:\/\/poligonosanmiguel.com\/ja\/wp-json\/wp\/v2\/posts\/11834\/revisions\/11837"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/poligonosanmiguel.com\/ja\/wp-json\/wp\/v2\/media\/11832"}],"wp:attachment":[{"href":"https:\/\/poligonosanmiguel.com\/ja\/wp-json\/wp\/v2\/media?parent=11834"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/poligonosanmiguel.com\/ja\/wp-json\/wp\/v2\/categories?post=11834"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/poligonosanmiguel.com\/ja\/wp-json\/wp\/v2\/tags?post=11834"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}